Stratton Equipment

  • 127 Hwy 617 North
  • Stratton, ON P0W 1N0
  • Call Us: (807) 483-7777
  • https://strattonequipment.com/
Print This Page

2026 Sennebogen Demolition machine 825 Demolition

Information

2026 Sennebogen Demolition machine 825 Demolition

The powerful SENNEBOGEN 825 E demolition excavator is compact and therefore ideal for demolition projects in confined spaces, for example in cramped inner cities. Equipped with a grab, the flexible demolition excavator also enables efficient grabbing, removal, sorting and loading of materials on site. Precise separation and pre-sorting of components on site saves you time. With an impressive reach, the 825 Demolition effortlessly masters even great heights without the constant need to move the machine.

Features may include:

  • Multifunctional machine: Quick change of different attachments
  • Versatile use for selective dismantling and sorting tasks
  • High handling capacity as a sorting machine
  • Quick readiness for use: Direct unloading on site without set-up effort
  • Perfect for demolition and sorting tasks in confined spaces
  • Space-saving dimensions, e.g. for use on urban construction sites
  • Easy transport on a low-loader without dismantling the equipment
  • Small transport width, e.g. variant with telescopic crawler undercarriage
  • Robust design and safety features ensure safe working in the demolition area
  • Variant with telescopic, stable crawler undercarriage
  • Mobile version with sturdy claws support and tires that enable driving on roads

Photos

Highlights

  • Stratton, Ontario
  • 2026
  • Sennebogen
  • Demolition machine 825 Demolition
  • Stage V: Cummins B6.7
  • Available

Specifications

  • 2026
  • Sennebogen
  • Demolition machine
  • 825 Demolition
  • Grapple
  • Stage V: Cummins B6.7
  • 129 kW / 2200 rpm
  • Water-cooled, charge-air cooling
  • (Electric) 110 kW / 400 Volt / 50 Hz
  • Compact planetary gear
  • Load-sensing / LDUV
  • 410 l/min
  • Spring-loaded multi-disk brake
  • 24 V | Central electrical distributor, battery disconnect switch
  • Slewing: 0-8 min?¹
  • Proportional, precision hydraulic
  • Maxcab, elevating 2.80m / tilt 30°
  • Pipe fracture safety devices
  • 700 mm triple grouser shoes (Optional: 800 mm triple grouser shoes / 700 mm flat track shoes)
  • 450 l
  • 310 l
  • 2 x 155 Ah, main switch